REMOVAL AND INSTALLATION OF 3-POINT HITCH IMPLEMENT (WITH P.T.O SHAFT)
MOWER IMPLEMENT
1. Park the tractor on level ground
and apply the parking brake.
M46O610A
(1) Lift Control Lever
2. To lift the lower link, pull the lift
control lever backward and stop
the engine.
(1) Lift (2) Connection Linkage
M46O612A
3. Roll the mower deck under the
tractor and position for connection
to the lift linkage.
When rolling the mower deck
under the tractor, be very care-
ful not to strike the hydraulic
lter with the mower deck.
IMPORTANT
tb3O611A