5.2 Operang interfaces
Commissioning the inverter requires an operator-process interface.
5.2.1 Keypad
The keypad is an easy means for the local operaon, parameterisaon, and diagnoscs of the
inverter.
The keypad is simply connected to the diagnosc interface on the front of the inverter.
The keypad can also be connected and removed during operaon.
Detailed informaon on the keypad can be found in the appendix:
4Operate and parameterise the inverter with keypad ^ 430
Commissioning
Operang interfaces
Keypad
35

Table of Contents

Other manuals for Lenze I51AE175F

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Lenze I51AE175F and is the answer not in the manual?

Lenze I51AE175F Specifications

General IconGeneral
BrandLenze
ModelI51AE175F
CategoryInverter
LanguageEnglish

Related product manuals