Boom extension
4.2 Description of the rigging work
Lattice extension operating instructions 3 112 441 en 4 - 13
GMK 4100/4100-L/5095
11.01.2008
Main boom con-
nection – section 3
(A) – Establishing the connection
If necessary, bring the connections (2) on
the left side of the main boom head into the
position for operating with the lattice exten-
sion;
à p. 3 - 34.
Lay the short ends (1) on the left-hand side
out of section 3 and up to the main boom
head.
Remove the protective caps and connect the
short ends (1) to the connections (2).
(B) – Disconnecting the connection
Disconnect the short ends (1) from the con-
nections (2).
Close the short ends and the connections with the protective caps.
Guide the short ends (1) on the left in section 3 and lay them in front of
the lower cross-strut so that they hang out of section 3 when raising.
s

Table of Contents

Other manuals for Manitowoc GROVE GMK 5095

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc GROVE GMK 5095 and is the answer not in the manual?

Manitowoc GROVE GMK 5095 Specifications

General IconGeneral
BrandManitowoc
ModelGROVE GMK 5095
CategoryConstruction Equipment
LanguageEnglish

Related product manuals