Maintenance work on the carrier
7.9 Axle lines
09.03.2018
Maintenance manual 3 302 746 en 7 - 61
GMK5200-1
7.9 Axle lines
• Comply also with the à Run-in regulations, p. 4 - 1.
7.9.1 General inspection
• Investigate any unusual running noises from the axle centre drives and
the final drives.
• Check the axle centre drives/final drives and the connections for leaks. If
consumables are leaking;
à Axle centre drives – checking the oil level, p. 7 - 61,
à Final drives – checking the oil level, p. 7 - 67.
• Check that pipes and hoses are tightly connected and not damaged.
If any damage is found, report it to Manitowoc Crane Care or an authorised
GROVE dealer or an authorised specialist workshop.
7.9.2 Axle centre drives – checking the oil level
Spare parts and
tools
1)
Additional equipment (3rd driven axle line)
Prerequisites – The truck crane must be raised on outriggers or parked over an inspection
pit.
– The engine must be switched off and secured against unauthorised use;
à p. 2 - 3.
s
for drive Designation Quantity GROVE part no.
10 x 6 x 10 Gasket 30 x 36 Cu DIN 7603 3 00117151
10 x 8 x 10
1)
Gasket 30 x 36 Cu DIN 7603 4 00117151