Maintenance work on the superstructure
8.3 Hoists
09.03.2018
Maintenance manual 3 302 746 en 8 - 13
GMK5200-1
8.3.5 Having a partial inspection carried out
Only suitably trained specialists should carry out a partial inspection of
– the multiple-disc brake,
– the plug connections between the hydraulic motor and the multiple-disk
brake,
– the plug connections between the multiple-disk brake and transmission
unit
and be permitted to exchange parts with signs of wear.
8.3.6 Having a general inspection carried out
H
When carrying out the general inspection of the hoists, also observe the
information contained in
Measures required for winch monitoring, p. 5 - 21.
The general inspection involves removing the transmission and sending it
to the manufacturer to be examined.
H
For transmissions that have undergone a general overhaul, an oil change
must be carried out after 200 and 1000 operating hours;
à Run-in regula-
tions
, p. 4 - 1.
Y 3
Y 6

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc Grove GMK 5200-1 and is the answer not in the manual?

Manitowoc Grove GMK 5200-1 Specifications

General IconGeneral
BrandManitowoc
ModelGrove GMK 5200-1
CategoryConstruction Equipment
LanguageEnglish

Related product manuals