Maintenance work on the superstructure
8.2 Symbols for maintenance work
09.03.2018
Maintenance manual 3 302 746 en 8 - 7
GMK5200-1
8.2 Symbols for maintenance work
Check the following symbols every day before starting work.
CCS • Check the symbols on the CCS start menu (Crane Control System) in the
crane cab each day before starting work.
• The Start menu shows the most important measurements and the Warn-
ing submenu shows all pending warning messages;
à Operating manual.
Warning submenu If a symbol is displayed, you must carry out the maintenance work:
Hydraulic oil filter; Ã p. 8 - 39.