Maintenance work on the carrier
7.18 Air conditioning system
09.03.2018
Maintenance manual 3 302 746 en 7 - 131
GMK5200-1
7.18 Air conditioning system
7.18.1 Checking the air conditioning system
• Switch on the air-conditioning system; à Operating manual.
• Check that cooling takes place. If it does not, the air conditioning system
is defective.
• Switch the air conditioning system off.
If the air conditioning system is defective
• Do not start it up again to avoid further damage.
Have the air-conditioning system repaired as soon as possible by Manitowoc
Crane Care
or an authorised GROVE dealer or an authorised specialist work-
shop.
7.18.2 Checking hoses
• Check all refrigerant hoses for damage and areas of wear.
Have damaged hoses checked by Manitowoc Crane Care or an authorised
GROVE dealer or an authorised specialist workshop only.
M 1
M 6
G
Risk of burns due to escaping refrigerant.
Wear suitable safety glasses and gloves when checking the hoses and con-
nections.
This will prevent injury from suddenly escaping refrigerant. Seek medical
attention if the skin or eyes come into contact with the refrigerant.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc Grove GMK 5200-1 and is the answer not in the manual?

Manitowoc Grove GMK 5200-1 Specifications

General IconGeneral
BrandManitowoc
ModelGrove GMK 5200-1
CategoryConstruction Equipment
LanguageEnglish

Related product manuals