EasyManuals Logo
Home>Mercury>Engine>150XRI

Mercury 150XRI User Manual

Mercury 150XRI
631 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #585 background imageLoading...
Page #585 background image
ATTACHMENTS / CONTROL LINKAGE
Page 7-6 90-883728 JULY 2001
Installing Steering Cables
IMPORTANT: Lubricate inside of outboard tilt tube, inside of steering cable mount-
ing tube and rubber O-ring seal (located in outboard tilt tube) with Quicksilver 2-4-C
with Teflon before installing steering cables.
Lubricate inside of outboard tilt tube and inside of steering cable mounting tube with
Quicksilver 2-4-C with Teflon. Verify rubber O-ring seal (a) (located in outboard tilt tube)
is lubricated.
51890
a
Insert steering cable ends (a) thru outboard tilt tube (b) and cable mounting tube (c).
Thread steering cable attaching nuts (d) on to tubes hand tight.
NOTE: Torque steering cable attaching nuts only after final steering adjustments have
been made.
51891
a
b
d
c
Place a mark (a) on steering cable mounting tube (b) 5/8 in. (16 mm) from end of mounting
tube. Slide plastic spacer (c), O-ring (d) and cap (e) over steering cable.
5/8″(16 mm)
51890
a
b
c
d
e
Thread cap (e) onto steering cable mounting tube, up to mark (a).
51890
a
e

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Mercury 150XRI and is the answer not in the manual?

Mercury 150XRI Specifications

General IconGeneral
BrandMercury
Model150XRI
CategoryEngine
LanguageEnglish

Related product manuals