3 Operation Procedure for DriveProgramming
3 - 14
DriveProgramming User’s Manual (I622-E1)
You can restart the stopped program by performing the following operations. When the program is
restarted, all tasks are started simultaneously from the beginning.
• When the DriveProgramming Function Selection (UE-02) is set to 01 ([PRG] terminal): a reset input
via the control circuit terminal while the PRG terminal is ON, or turning ON the PRG terminal again.
• When the DriveProgramming Function Selection (UE-02) is set to 02 (Always): a reset input via the con-
trol circuit terminal, or turning ON the power supply for the inverter again.
Precautions for Correct Use
• You cannot restart the DriveProgramming by pressing the STOP/RESET key of the LCD Operator.
Set data 28 (RS:Reset) to input terminal 1 to 9, A and B. After that, turn ON that terminal.
• When the Reset mode selection (CA-72) is set to 00 (On to Release Trip) or 01 (Off to Release Trip), the
DriveProgramming can be restarted by a reset input even when there is no trip.
Restart when the EzSQ function enable (UE-02) is set to 01 ([PRG] terminal):
Restart after trip when the EzSQ function enable (UE-02) is set to 02 (Always)
(without “on trip goto” command):
3-3-5 DriveProgramming Restart
Power OFF
Power ON
PRG terminal OFF
PRG terminal
ON
PRG terminal OFF
PRG terminal
ON
Start
Start
Start
Start
First
First
First
First
Stop
Stop
Stop
Stop
Start
First
Stop
Start
Start
Start
Start
First
First
First
First
Stop
Stop
Stop
Stop
Start
First
Stop
Power supply
[PRG] terminal
Input terminal 1 to 9, A and B
Task1
Task2
Task3
Task4
Task5
Trip
Power ON
Power OFFTrip reset
Start
Start
Start
Start
First
First
First
First
Stop
Stop
Stop
Stop
Start
First
Stop
Start
Start
Start
Start
First
First
First
First
Stop
Stop
Stop
Stop
Start
First
Stop
Power supply
Task1
Task2
Task3
Task4
Task5