7.20
CVT / TRANSMISSION
9923983 - 2012-2013 RZR 170 Service Manual
© Copyright 2012 Polaris Sales Inc.
5. Assemble output shaft housing to case with existing
shims. If components were replaced you must inspect
output gear pinion depth.
See “Output Gear Pinion
Depth Adjustment” on page 7.21.
6. Install outer cover (oil fill cover).
7. Add 27 fl. oz. (800ml) of oil.
8. Verify vent hose is clear. After installing engine in
frame, route and secure hose lightly as shown with
open end (G) pointing down.
9. After installation in the frame, adjust shift cables in the
following manner:
• Place gear selector in NEUTRAL
• Verify transmission shift arm is in NEUTRAL
• Attach cables to bracket and to shift arm.
• Adjust each cable until slack is removed from each
cable and tighten cable adjusters securely.
• Check for proper shift operation
Output Housing:
14 ft-lbs (19 Nm)
LUBRICANT CAPACITY
AGL - Synthetic ATV
Gearcase Lubricant
27 fl. oz. (800 ml)
Shift Arm - Neutral Position