24
ATOM linear encoder system
7. Remove temporary dowels (if tted).
6. After 24hours when epoxy is cured, clean scale using Renishaw scale wipes or a clean, dry, lint-free cloth.
5. Apply fillet of RGG-2 two part epoxy adhesive. Epoxycan be applied to one or both sides of the scale. Ensure epoxy does not wick onto scale surface (end reference mark shown).
The datum clamp does not need to be positioned adjacent to a reference mark. It can be positioned anywhere along the axis depending upon the customers’ requirements.