6 x Operation
95
FA ROTEX HeatPumpSolarUnit - Part 2 - 05/2009
6.4.3 Parameter table factory settings
Code 1
Code 2
Parameter name
Default factory settings
Retrospective
changes
Value ECO
2)
Range Increment Unit Date Value
0 Access authorisation
00 Authorisation level 3 1 2 - 3 1 —
1 Weather-dependent target value regulation
00 Lowest ambient temperature (Lo_A) -10 -10 -20 - 5 1 °C
01 Highest ambient temperature (Hi_A) 15 16 10 - 20 1 °C
02 Target value at lowest ambient temperature 40 35 25 - 55 1 °C
03 Target value at highest ambient temperature 25 25 25 - 55 1 °C
2 Legionella protection
00 Operating interval FR FR every day — —
01Status 100 - 1 ——
02 Starting time 23:00 23:00 0:00 - 23:00 1:00 h
03 Target value 65 65 40 - 80 5 °C
04 Holding time 10 10 5 - 60 5 Min.
3 Automatic Restart
00Status 000 - 1 ——
4 Operating the reserve heating and switch-off temperature of room heating
00Status 110 - 1 ——
01 Priority 0 0 0 - 1 — —
02 Switch-off room heating in the summer 35 16 14 - 35 1 °C
5 Bivalence temperature and priority temperature of room heating
00 Status bivalence temperature 1 1 0 - 1 — —
01 Bivalence temperature 0 -7 -15 - 20 1 °C
02 Priority for room heating 0 1 0 - 1 — —
03 Priority temperature of room heating 0 -7 -15 - 20 1 °C
04 Target value correction for hot water 10 0 0 - 20 1 °C
6 Hysteresis (DT) for water heating
00 Start 5 5 1 - 20 1
01 Stop 2 2 2 - 10 1
7 Step length for hot water
00 Step length for hot water 3 3 2 - 4 1 °C
8 Configuration of water heating
00 Minimum runtime heat pump 5 5 0 - 20 1 Min.
01 Maximum runtime heat pump 30 50 5 - 95 5 Min.
02 Restart time heat pump 3 1 0 - 10 0.5 h
03 Delay time Booster Heater (EHS): 20 45 20 - 95 5 Min.