EasyManuals Logo
Home>Shimadzu>Security Sensors>GC-2010

Shimadzu GC-2010 User Manual

Shimadzu GC-2010
88 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #24 background imageLoading...
Page #24 background image
3 Basic Operation
3.5
3.
18 FPD-2010
3.5
Checking Glass Insert and Injection Port Septum
This section describes how to check the glass insert. For the detailed procedure, refer to "12. Injection port"
in the GC-2010 Instruction Manual.
Confirm that the glass insert suits the purpose.
 WARNING
High temperature
You might suffer burns. Be sure to confirm that the sample injection port has
cooled down before staring the operations.
For split For splitless
Fig. 3.5.1 
Replace the injection port septum around when the times of injection reach 100.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Shimadzu GC-2010 and is the answer not in the manual?

Shimadzu GC-2010 Specifications

General IconGeneral
BrandShimadzu
ModelGC-2010
CategorySecurity Sensors
LanguageEnglish

Related product manuals