SIMOTION D410
Commissioning Manual, 02/2012
29
Commissioning (hardware)
2
2.1 Prerequisites for commissioning
Prerequisites
Prerequisites for commissioning the SIMOTION D410:
You have completed installation and the wiring of your system with SIMOTION D410.
A programming device / PC is available.
Connecting a programming device / PC to SIMOTION D410
You can interconnect the programming device / PC:
With the PROFIBUS interface of SIMOTION D410 DP (X21 connector) using a
connecting cable.
Information pertaining to cable lengths for PROFIBUS DP is available in the
SIMOTION D410
Manual.
With the PROFINET interface of SIMOTION D410 PN (X200 or X201 connector) using a
twisted pair cable.
For information on communication via PROFINET, refer to section Configuring
PROFINET
(only for D410 PN) (Page 59).
System requirements
System requirements for hardware commissioning:
The programming device must be equipped with a PROFIBUS or Ethernet adapter.
The programming device / PC must be interconnected with SIMOTION D410 DP
(connector X21) for online communication on PROFIBUS DP.
The programming device / PC must be interconnected with SIMOTION D410 PN
(connector X200 and 201) for online communication on PROFINET.
You need a CF adapter on the programming device / PC to write to the Compact Flash
Card (for example, a SIMOTION firmware update).

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Siemens SIMOTION D410 Series and is the answer not in the manual?

Siemens SIMOTION D410 Series Specifications

General IconGeneral
BrandSiemens
ModelSIMOTION D410 Series
CategoryController
LanguageEnglish

Related product manuals