1 Preparations
1.1 At the branch
Check using the installation drawings and the shipping receipt whether all the required parts of the
drive unit are present and undamaged, especially:
- The rail sections and the section bushes.
- The drive unit.
- The chair base with armrest control.
- Various loose components, such as: Call and park units with joysticks, transformer flash card,
two-core power cable, charging contacts, rail brackets with fixing materials and an installation
drawing.
Consult the installation drawing and the bill of materials to check:
- The colour of the rail.
- The type and colour of the upholstery.
1.2 At the customer’s home
- Inspect the area in which you plan to install the stairlift to verify that all the necessary and
agreed structural alterations have been carried out. If these alterations have not been carried
out then you should consult the Chief Engineer or the Service Manager.
- Inspect the area where you plan to install the drive unit for damage. Inform the customer of
any damage you find, and make a note on the requisite form. Have the customer sign the
form.
Fig. 1-1 Rail sections
Fig. 1-2 Drive unit Fig. 1-3 Chair base Fig. 1-4 Various

Other manuals for ThyssenKrupp Flow2

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ThyssenKrupp Flow2 and is the answer not in the manual?

ThyssenKrupp Flow2 Specifications

General IconGeneral
BrandThyssenKrupp
ModelFlow2
CategoryStairlifts
LanguageEnglish

Related product manuals