EFI fuse
IGN
fuse
6.
Inspect the ignition timing.
Standard: 7" (BTDC)
7.
If the ignition timing is outside the standard, loosen the
distributor set bolt and rotate the distributor to adjust the
ignition timing to the standard value.
NO-LOAD MAXIMUM SPEED
MEASUREMENT
1.
Warm-up the engine.
Standard
Coolant temperature: 75 to 80°C (167 to 176°F) or more
2. Attach a rev counter to the terminal for measuring engine
speed (Rev terminal).
3.
Fully depress the accelerator pedal and measure the
maximum speed.
Standard: Refer to the repair manual for each vehicle
model.
COMPRESSION INSPECTION
1.
Warm-up the engine.
Standard
Coolant temperature:
75
to 80°C (167 to 176°F) or more
2. Disconnect the battery negative terminal.
3.
Remove the spark plug
4.
Remove the IGN fuse and EFI fuse.
5.
Remove the throttle body set nut and insert a wooden block
etc. between the throttle body and the surge tank to maintain
a clearance of
3
to
5
mm (0.12 to 0.20 in.).
Note:
Secure the intake air.