EasyManuals Logo
Home>Wacker Neuson>Construction Equipment>RTx-SC3

Wacker Neuson RTx-SC3 User Manual

Wacker Neuson RTx-SC3
180 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #41 background imageLoading...
Page #41 background image
wc_tx003863gb_FM10.fm
41
RT / RTx Operation
4 Operation
4.1 Preparing the Machine for First Use
1. Make sure all loose packaging materials have been removed from the machine.
2. Check the machine and its components for damage. If there is visible damage,
do not operate the machine. Contact your Wacker Neuson dealer immediately
for assistance.
3. Take inventory of all items included with the machine and verify that all loose
components and fasteners are accounted for.
4. Attach component parts not already attached.
5. Add fluids as needed and applicable, such as fuel and engine oil.
6. Move the machine to its operating location.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Wacker Neuson RTx-SC3 and is the answer not in the manual?

Wacker Neuson RTx-SC3 Specifications

General IconGeneral
BrandWacker Neuson
ModelRTx-SC3
CategoryConstruction Equipment
LanguageEnglish

Related product manuals