EasyManuals Logo
Home>ABB>Measuring Instruments>NGC8206

ABB NGC8206 User Manual

ABB NGC8206
239 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #58 background imageLoading...
Page #58 background image
2
101510 Rev. AG Page 2–
39
disconnects batteries when the voltage drops below the minimum recharge level.
Minimum configuration consists of dual 50 W solar panels. System is designed to
accommodate dual 110 W solar panels as a maximum.
Auxiliary fusing is not available when using the optional
heater.
Figure 2-30 6800 Enclosure with 12/24 VDC Solar Panel Power Pack
Option
2.19.2 115/230 VAC UPS Power Option (24 VDC Systems Only)
This option assumes site availability of 115/230 VAC power. A UPS
(Uninterruptible Power Supply) and two 50 Ah batteries provide backup power for
short power interruptions. 100 Ah batteries are available for longer autonomy:
• 3-day autonomy with standard 50 Ah batteries and no optional heater
• 36 hour autonomy with standard 50 Ah batteries and optional heater
Space is provided for communication equipment and fusing for auxiliary
equipment. Auxiliary fusing supports a maximum of three 1 amp loads. The
system disconnects batteries when the voltage drops below the minimum
recharge level.
Auxiliary fusing is disabled when on UPS power.
Solar Panel
Solar Panel
Applicable only
on 12 VDC
systems

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ABB NGC8206 and is the answer not in the manual?

ABB NGC8206 Specifications

General IconGeneral
BrandABB
ModelNGC8206
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals