Page 3–20
2101510 Rev. AG
Figure 3-20 Shelf Installation
3.12 NGC Installation
Once the mounting system has been installed, regardless of the type used, follow
these instructions to install the NGC onto the mounting pipe.
Both the large and small environmental enclosures are
shipped with the NGC mounting system installed inside the
environmental enclosure. The following instructions should be
followed to install the NGC onto the mounting pipe.
Before beginning, review the procedure and the materials required for installation.
3.12.1 Materials
Installed mounting pipe
4 ea. 5/16” hex socket screws (optional for use with mounting pipe with
flange kit)
NGC
3.12.2 Instructions
When positioning the unit, take into consideration the
mounting of the sample conditioning system, conduit
locations and access to the rear end cap of the unit.
1) Position the NGC on top of the 2” pipe stand (see Figure 3-21
), in close
approximation to correct orientation.
2) If the installation has the optional mounting pipe with flange, ensure the screw
holes in the upper flange align with the holes located in the NGC neck bottom
(see Figure 3-22
).
For installation inside of an environmental enclosure, the front display of
the unit would normally face left, with the feed-through assembly facing
the front opening of the enclosure. This allows screen visibility, access
OPTIONAL MOUNTING
FLANGE PIPE
2" PIPE COUPLING
WALL SHELF

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ABB NGC8206 and is the answer not in the manual?

ABB NGC8206 Specifications

General IconGeneral
BrandABB
ModelNGC8206
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals