EasyManuals Logo

ABB TPL73-B12 User Manual

ABB TPL73-B12
154 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #139 background imageLoading...
Page #139 background image
Operation Manual / TPL73-B.. - 85-B11/ -B12
9 Shut-down at short notice / 9.3 Shutting off inlets and outlets
© Copyright 2018 . All rights reserved. HZTL2480_EN Revision D July 2018
9.3 Shutting off inlets and outlets
CAUTION
Shut off the lubricating oil supply to the turbocharger.
w This applies only to engines with several turbochargers and common
air as well as exhaust gas receivers.
u Shut off compressor casing outlet, gas inlet and gas outlet by fitting
cover plates.
NOTICE
In this respect, refer to the engine manufacturer's instructions.
9.4 Bypass the turbocharger
CAUTION
Shut off the lubricating oil supply to the turbocharger.
w This applies to engines with one turbocharger only:
w The connections are ready and pipes for the bypass are available.
u Fit bypass around turbocharger.
NOTICE
In this respect, refer to the engine manufacturer's instructions.
Page 137 / 151

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ABB TPL73-B12 and is the answer not in the manual?

ABB TPL73-B12 Specifications

General IconGeneral
BrandABB
ModelTPL73-B12
CategoryIndustrial Equipment
LanguageEnglish

Related product manuals