EasyManuals Logo
Home>Azbil>Control Unit>AGVB

Azbil AGVB User Manual

Azbil AGVB
106 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #26 background imageLoading...
Page #26 background image
2-4. Air supply connection
See the users manual for your positioner.
Pneumatic single-acting valve positioner (model HTP):
document No. OM2-8310-0200
Pneumatic single-acting valve positioner (model VPE):
document No. OM2-8310-0410
Smart valve positioner (model AVP300/301/302 (integral type)):
document No. CM2-AVP300-2001
Smart valve positioner (model AVP200/201/202 (remote type)):
document No. CM2-AVP300-2001
Smart valve positioner (model AVP701/702):
document No. CM2-AVP702-2001
Smart valve positioner (with fieldbus)(model AVP703):
document No. CM2-AVP703-2001
2-5. Inspection after Installation and Precautions for Operation
Handling Precautions
Check the air pipe connections for leakage before use.
Make sure that the bolts and nuts of the diaphragm case, bonnet, etc., are firmly
tightened.
The temperature inside and outside the valve should be increased or decreased gradu-
ally (100 °C/h or less). Avoid operating the valve while the valve temperature is increas-
ing or decreasing.
When using the valve at low temperatures, gradually lower the temperature (50°C/h or
less)
After applying pressure to the valve, check for leakage from the valve body, gland pack-
ing, and gaskets. It is especially important, if the process fluid temperature is 400°C or
higher, to tighten the nuts further after raising the temperature of the valve. By doing so,
the valve will serve for a longer period without requiring maintenance. Use the torque
indicated in Table 5-1 to Table 5-3.
For a valve with a lubricator, check whether the bonnet section has been lubricated or
not. To do this, loosen the lubricator handle and turn the squeeze screw. If the squeeze
screw turns lightly, replenish grease using the following procedure.
Grease replenishing procedure
(1) Obtain grease of the type indicated on the nameplate.
(2) Tightly close the lubricator handle.
(3) Remove the squeeze screw, apply grease, and set the squeeze screw.
(4) Repeat steps 2 and 3 until turning of the squeeze screw becomes heavier. Tightly close the
lubricator handle.
2-6

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Azbil AGVB and is the answer not in the manual?

Azbil AGVB Specifications

General IconGeneral
BrandAzbil
ModelAGVB
CategoryControl Unit
LanguageEnglish

Related product manuals