EasyManuals Logo

Brother BAS-326G PS User Manual

Brother BAS-326G PS
84 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #13 background imageLoading...
Page #13 background image
3. INSTALLATION
BAS-326G PS
4
3-2. Installing the control box
Remove the eight screws (1), and then
remove the control box cover (2).
(3) Control box
(4) Bolts [4 pcs.]
(5) Plain washers [4 pcs.]
(6) Spring washers [4 pcs.]
(7) Nuts [8 pcs.]
(8) Power switch
(9) Wood screws [2 pcs.]
(10) Staples [4 pcs.]
3-3. Installing the oil pan
(1) Oil pan
(2) Nails [7 pcs.]
(3) Rubber cushions [4 pcs.]
(4) Waste oil tank
1841B
Operator
1840B
2142B

Table of Contents

Other manuals for Brother BAS-326G PS

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Brother BAS-326G PS and is the answer not in the manual?

Brother BAS-326G PS Specifications

General IconGeneral
BrandBrother
ModelBAS-326G PS
CategorySewing Machine
LanguageEnglish

Related product manuals