350
400
200
24h
p.
8 - Manual Code:
11
9GV18 ver.
1.1 12/2011 © CAME Cancelli Automatici S.p.a. - The data and information in this manual may be changed at any time and without obligation on the part of Came Cancelli Automatici S.p.a. to notify said changes.
ENGLISH
Assmble the four clamps to the anchoring base.
Fill the pit with cement, submerge the base making
sure that the corrugated tubes pass through the hole
on the base.The base must be perfectly level, clean and
with the bolt threading completely on the surface.
Wait at least 24 hrs for everything to solidify.
Remove the nuts and washers from the
threaded screws.
The following illustrations are just examples, in that the space for securing the operator and accessories depends on the overall
measurements.It is up to the installer to choose the most suited solution.
Dig a hole for the anchoring base, set
the any corrugated tubes for connections
coming from the juction pit.
N.B.: the number of tubes depends on
the type of accessories featured.
Preparing the anchoring base
M12 UNI 5588 nut
Washer
M12 x 40 UNI 5739
screw