Installing the RTU Open
RTU Open v3 CARRIER CORPORATION ©2019
Installation and Start-up Guide All rights reserved
39
To wire a compressor safety input to the controller
NOTES
An isolation relay may be required if the RTU Open is powered separately from the equipment's control power
circuit.
Follow device manufacturer's installation and operating instructions.
Wiring an occupancy switch or door contact
Occupancy switch - field-supplied
Door contact - field-supplied
Occupancy or door contact switches may be installed to provide an alternate means of occupancy determination
or heating and cooling lockout. See Sequence of Operation (page 44) for additional details.
Wiring specifications
Cable from sensor to controller: If <100 ft (30.5 meters) 22 AWG, unshielded
If >100 ft (30.5 meters) 22 AWG, shielded
Maximum length: 500 feet (152 meters)

Table of Contents

Other manuals for Carrier RTU Open v3

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Carrier RTU Open v3 and is the answer not in the manual?

Carrier RTU Open v3 Specifications

General IconGeneral
BrandCarrier
ModelRTU Open v3
CategoryController
LanguageEnglish

Related product manuals