Document revision history
RTU Open v3 CARRIER CORPORATION ©2019
Installation and Start-up Guide All rights reserved
107
Important changes to this document are listed below. Minor changes such as typographical or formatting errors are not
listed.
Date
Topic
Change description
Code*
12/3/19
Troubleshooting > To get the serial
number
As of 2019, serial numbers are laser-etched on the circuit
board
C-D
Appendix A > Service Configuration
Fixed error in System Fire / Smoke description
C-AE-MM-E
8/30/19
Indoor Air CO2
Corrected DCV Max Vent Damper Pos percent
C-TS-RC-O
Unit Configuration
Removed limit on Setpoint Adjustment Range
C-TS-RC-O
7/3/19
Appendix A > Service Configuration
VFD Speed Test - correction. Only Service Test muast be set to
Enable. Previously, it stated that both Service Test and Fan Test
must be set to Enable.
C-TS-CP-E
2/4/19
What is the RTU Open controller?
J1 Input 5 (SMK) wire color corrected from gray to blue.
C-TS-RD-E-JA
1/28/19
Wiring devices to the RTU Open's
Rnet port
Removed star configuration from the first paragraph.
X-TS-TS-O
What is the RTU Open controller?
In the drawing, corrected wire color for J1 Input-5 to blue from
dark gray
C-TS-RD-E-D
Specifications
Added surge CAUTION to Protection specification.
X-TS-AK-E-CC
10/29/18
To wire the Wireless Adapter for
wireless sensors
Added warning that the Wireless Adapter must be mounted on
the inside of the building
C-AE-WB-E
What is the RTU Open?
Removed SPT sensors.
C-D
Field-supplied hardware
Removed SPT sensors from space temperature sensors.
C-D
Wiring inputs and outputs
Removed SPT sensor from Input wiring table, added TruVu™ ET
Display, and referred user to the device's Installation and Start-
up Guide.
C-D
Wiring devices to the RTU Open's
Rnet port
Combined overview and wiring on the zone sensors and
touchscreen devices. Added TruVu™ ET Display.
C-D
Specifications
Reworded Rnet port specification and added power supplied by
Rnet port.
Reworded Protection specification and added first paragraph.
X-H-JS-O
8/24/17
Service Test
Added information that the unit must be shut down before
running Service Test and how to verify that.
C-TS-RD-BR
8/21/17
Sequence of Operation >
Economizer
Added information on Fault Detection & Diagnostics
C-AE-WB-E
Specifications
Corrected total number of supported wireless sensors to 5.
C-TS-JN-E
4/24/17
Analog Outputs
Added the load impedance when AO channels are used in a
voltage output type application.
C-AE-WB-E
4/18/17
Sequence of Operation - Cooling
Correction - OAT added to cooling algorithm re:economizer
C-TS-OC-BR
Document revision history

Table of Contents

Other manuals for Carrier RTU Open v3

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Carrier RTU Open v3 and is the answer not in the manual?

Carrier RTU Open v3 Specifications

General IconGeneral
BrandCarrier
ModelRTU Open v3
CategoryController
LanguageEnglish

Related product manuals