EasyManuals Logo
Home>Cisco>Switch>Nexus 7710

Cisco Nexus 7710 User Manual

Cisco Nexus 7710
222 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #107 background imageLoading...
Page #107 background image
Ensure that the Supervisor-3E module has not been inserted in the standby slot before using the migrate
sup kickstart <sup3-kickstart-image> system <sup3-system-image> command. If the supervisor-3E
module has already been inserted in the standby slot, the migration process will be aborted and the
supervisor-3E module will be powered down.
Do not reload or manually insert or remove any I/O or fabric module after using the migrate sup kickstart
<sup3-kickstart-image> system <sup3-system-image> command. Any removal or insertion of I/O or
fabric modules has to be done before initiating the migration process or after the migration is completed.
Do not remove or insert any Fabric Extender (FEX) modules during migration.
Insert the standby Supervisor-3E module into the chassis only when you are prompted to insert the
Supervisor-3E module during migration by a message on the system console.
After the Supervisor-3E module has been inserted during the migration process, do not remove or manually
reload the standby Supervisor-3E module.
Do not insert or remove any transceivers from any modules while the migration is in progress.
Do not remove any power supply modules or fan modules during the migration process.
Do not copy any configurations using the copy running-config startup-config command or the copy
running-config startup-config vdc-all from any other management session while migration is in progress.
Do not trigger any EPLD or BIOS upgrades during migration.
Do not trigger any ISSU during migration.
Do not perform migration from fabric module-2 to fabric module-3 during the supervisor-2E to
supervisor-3E migration.
Take a backup of the licenses and configuration before starting the migration procedure. In case of any
failure or loss of licenses and configuration in Supervisor-2E, disruptive migration has to be done to
upgrade to Supervisor- 3E. In such a scenario, all configurations and licenses have to be applied or
installed again. Backup the installed licenses from the switch to a USB drive by using the copy licenses
command. To view the current licenses installed on the switch, use the show license command.
switch# copy licenses usb1:<licenses_archive_file_name>.tar
Ensure that there is sufficient power in the chassis before starting the migration process. In case of a
power failure, redundant power supplies can then take over and migration will not be disrupted.
Downgrade to supervisor-2E modules from supervisor-3E modules is a disruptive procedure.
Case 1: Dual Supervisor Migration
To perform non-disruptive migration from Supervisor 2E modules to Supervisor 3E modules in a switch that
has both active and standby supervisor modules installed, follow these steps:
Before you begin
The minimum supported release for this procedure is Cisco NX-OS Release 8.4(1). If you are using an image
older than Cisco NX-OS Release 8.4(1), upgrade to Cisco NX-OS Release 8.4(1), and then perform
nondisruptive migration from Supervisor 2E modules to Supervisor 3E modules.
Cisco Nexus 7710 Switch Site Preparation and Hardware Installation Guide
95OL-30452-01.
Installing or Replacing Modules, Fan Trays, and Power Supplies
Case 1: Dual Supervisor Migration

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Cisco Nexus 7710 and is the answer not in the manual?

Cisco Nexus 7710 Specifications

General IconGeneral
BrandCisco
ModelNexus 7710
CategorySwitch
LanguageEnglish

Related product manuals