Pump Down Operation SiUS091133
383 Trial Operation and Field Settings
1. Pump Down Operation
Outline In order to protect the environment, be sure to conduct pump down operation when relocating or
disposing the unit.
Detail 1) Remove the valve caps from the liquid stop valve and the gas stop valve.
2) Carry out forced cooling operation.
3) After 5 to 10 minutes, close the liquid stop valve with a hexagonal wrench.
4) After 2 to 3 minutes, close the gas stop valve and stop the forced cooling operation.
Refer to page 384 for forced cooling operation.
09/12/15/18 class 24/30/36 class
Gas stop valve
Valve cap
Close
Liquid stop valve
Service port
(R13628)
Hexagonal
wrench
Hexagonal
wrench
(R14474)
Service port
Gas stop valve
Liquid stop valve
Valve cap
Close

Table of Contents

Other manuals for Daikin RXS30LVJU

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Daikin RXS30LVJU and is the answer not in the manual?

Daikin RXS30LVJU Specifications

General IconGeneral
BrandDaikin
ModelRXS30LVJU
CategoryAir Conditioner
LanguageEnglish

Related product manuals