EasyManuals Logo
Home>Daikin>Air Conditioner>Super Multi NX C-Series

Daikin Super Multi NX C-Series User Manual

Daikin Super Multi NX C-Series
298 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #243 background imageLoading...
Page #243 background image
Outdoor Unit (80 / 90 Class) SiE12-411
232 Removal Procedure
1.6 Removal of Electronic Expansion Valve and Thermistor
Procedure Warning Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Step
Procedure Points
1
Remove each wire
harness.
" Place the thermistor so that
its end comes up to the end
of the presser spring.
" Be careful not to lose the
presser spring for the
discharge pipe thermistor.
2
Take off the putty, and
remove each
thermistor.
S90:
" Outdoor air thermistor (Blue)
" Heat exchanger thermistor
(Gray)
" Discharge pipe thermistor
(Black)
S92: Gas pipe thermistor
" Room A (Black)
" Room B (Gray)
" Room C (Brown)
" Room D (Red)
S93: Liquid pipe thermistor
" Room A (Black)
" Room B (Gray)
" Room C (Yellow)
" Room D (Blue)
3
Remove the electronic
expansion valve coil.
Thermistor
Pipe
Thermistor
presser
spring

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Daikin Super Multi NX C-Series and is the answer not in the manual?

Daikin Super Multi NX C-Series Specifications

General IconGeneral
BrandDaikin
ModelSuper Multi NX C-Series
CategoryAir Conditioner
LanguageEnglish

Related product manuals