EasyManuals Logo
Home>Daikin>Air Conditioner>Super Multi NX C-Series

Daikin Super Multi NX C-Series User Manual

Daikin Super Multi NX C-Series
298 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #252 background imageLoading...
Page #252 background image
SiE12-411 Outdoor Unit (50 / 52 / 58 / 68 / 75 Class)
Removal Procedure 241
2.2 Removal of Electrical BOX
Procedure Warning Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Step
Procedure Points
1. Removing the tie wires
" Remove the piping in the
backward direction.
1 The figure shows the tie
pipe connections.
2
Remove the terminal
board fitting screw.
" Match the colours of the tie
wires to A, B, C and D ports
as follows.
(1) - Black Power
(2) - White Power
(3) - Red Transmission
" Wires are fixed to the
terminal board with screws.
" Terminal board is made of
integral moulded resin.
A port
B port
C port
D port
Electronic expansion
valve coils
Electrical box
Service monitor PCB
Service port
O
utdoor air thermistor
Fluid pipes
Gas pipe
Terminal board fitting screw
Wiring fixture
Earth terminal
screw
Power terminal
board
(L)-White
(N)-Black
A port
B port
C port
D port

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Daikin Super Multi NX C-Series and is the answer not in the manual?

Daikin Super Multi NX C-Series Specifications

General IconGeneral
BrandDaikin
ModelSuper Multi NX C-Series
CategoryAir Conditioner
LanguageEnglish

Related product manuals