60 Dell PowerConnect 55xx Systems User Guide
FILE LOCATION: C:\Users\gina\Desktop\Checkout_new\Maintenance Projects\Dell
Contax\CxUG_InitialConfiguration_gsg.fm
DELL CONFIDENTIAL â PRELIMINARY 9/11/12 - FOR PROOF ONLY
Booting the Switch
After the local terminal is connected, turn on power. The switch then goes
through power-on self-test (POST). POST runs every time the switch is
started and checks hardware components, to determine if the switch is
operational before completely booting. If the system detects a critical
problem, the boot process stops. If POST passes successfully, a valid
executable image is loaded into RAM. POST messages are displayed on the
terminal and indicate test success or failure.
The boot process runs for approximately 40-45seconds.
When the boot process completes, the following LEDs are lit, as shown in
Figure 5-2:
â˘Power
⢠Status
⢠Fan (should be green)
⢠RPS (if it is being used)
Figure 5-2. Initial LEDs