Replacing the control
To place a control into the control enclosure, follow the
procedure outlined below:
1. Engage control on enclosure hinges.
2. Connect control ground lead to back panel.
3. Reconnect control to back panel at TB2, located at the
bottom of back panel.
4. Push closed disconnect switch V1 (and V6 if present).
5. Pull open current shorting switch C.
6. Close control and tighten locking screws.
17
CL-6 SERIES CONTROL INSTALLATION, OPERATION, AND MAINTENANCE INSTRUCTIONS MN225016EN January 2016

Table of Contents

Other manuals for Eaton 600 A 15 kV class push-OP

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Eaton 600 A 15 kV class push-OP and is the answer not in the manual?

Eaton 600 A 15 kV class push-OP Specifications

General IconGeneral
BrandEaton
Model600 A 15 kV class push-OP
CategoryCables and connectors
LanguageEnglish

Related product manuals