Installation
Boiler installation
Boiler installation
The boiler should be positioned in a
frost-proof boiler room. If the boiler
room is on the roof, the boiler itself may
never be the highest point of the instal-
lation.
When positioning the boiler, please
note the recommended minimum clea-
rance in the picture. When the boiler is
positioned with less free space, mainte-
nance activities will be more difficult.
Once the boiler is in the correct positi-
on, the wooden blocks (1) should be
removed and the adjustable feet (2)
(with vibration absorption dampers)
should be adjusted to the right height.
Water and gas connections should be
done after mounting the feet, as they
affect the exact height of all connecti-
ons.
10
1
2 2

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the elco R 600 and is the answer not in the manual?

elco R 600 Specifications

General IconGeneral
Brandelco
ModelR 600
CategoryBoiler
LanguageEnglish

Related product manuals