GE HEALTHCARE
DIRECTION 5394141, REVISION 5 LOGIQ™ P5 SEVICE MANUAL
Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8-51
8-2-15 Side Left Cover
8-2-15-1 Tools
• Common pilIips screwdrivers
8-2-15-2 Preparations
• Shut down the system and switch off the main breaker.
8-2-15-3 Removal procedure
1.) Unscrew 2 screws (1-2).
2.) Remove the left cover.
3.) Perform the following functional tests. If all are successful, include the debrief script provided below.
Figure 8-84 2 screw on Side left cover
Figure 8-85 Open Side left cover
Table 8-16 Functional Tests
Service Manual
Section
Functional Test / Diagnostic Test Debrief Script
Section 4-3-1
Power On/Boot Up
“Service Manual, Direction
5394141, Rev 1+, Section 8-2-15. Equipment
passed all required tests and is ready for use. “
Section 4-3-2
Power Off / Shutdown
Section 4-8-1
Cover Parts Function Validation
Section 10-5-5
Physical Inspection