GE HEALTHCARE
DIRECTION 5394141, REVISION 5 LOGIQ™ P5 SEVICE MANUAL
8-114 Section 8-2 - DISASSEMBLY/RE-ASSEMBLY
8-2-50 Fuse Set
8-2-50-1 Tools
• Common pilIips screwdrivers
• Allen/Unbraco wrench
• Stubby screwdriver (Flat tip and Cross tip)
8-2-50-2 Preparations
• Shut down the system and switch off the main breaker.
8-2-50-3 Removal procedure
1.) Remove the AC Transbox assy. Refer to the 8-2-49 "Transbox Assy 110V/220V" on page 8-109.
2.) Replace the 2 fuses located on the ACPC assy in the transbox assy.
3.) Perform the following functional tests. If all are successful, include the debrief script provided below.
8-2-50-4 Mounting Procedure
Install the new parts in the reverse order of removal.
Figure 8-151 FUSE in Transbox assy
Table 8-51 Functional Tests
Service Manual
Section
Functional Test / Diagnostic Test Debrief Script
Section 4-3-1
Power On/Boot Up
“Service Manual, Direction
5394141, Rev 2+, Section 8-2-50. Equipment
passed all required tests and is ready for use. “
Section 4-3-2
Power Off / Shutdown
Section 4-9-14
Fuse set Function Validation Procedure
Section 10-5-2-2
Peripheral/Option Checks