GE HEALTHCARE
DIRECTION 5394141, REVISION 5 LOGIQ™ P5 SEVICE MANUAL
8-70 Section 8-2 - DISASSEMBLY/RE-ASSEMBLY
8-2-27 EMI Cover R
8-2-27-1 Tools
• Common pilIips screwdrivers
8-2-27-2 Preparations
• Shut down the system and switch off the main breaker.
8-2-27-3 Removal procedure
1.) Remove the Side Right Cover. Refer to the 8-2-16 "Side Right Cover" on page 8-52.
2.) Unscrew 9 screws (1-9).
3.) Perform the following functional tests. If all are successful, include the debrief script provided below.
8-2-27-4 Mounting Procedure
Install the new parts in the reverse order of removal.
Figure 8-105 EMI Cover R
Table 8-28 Functional Tests
Service Manual
Section
Functional Test / Diagnostic Test Debrief Script
Section 4-3-1
Power On/Boot Up
“Service Manual, Direction
5394141, Rev 1+, Section 8-2-27. Equipment
passed all required tests and is ready for use. “
Section 4-3-2
Power Off / Shutdown
Section 4-8-1
Cover Parts Function Validation
Section 10-5-5
Physical Inspection