GE HEALTHCARE
DIRECTION 5394141, REVISION 5 LOGIQ™ P5 SEVICE MANUAL
Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8-97
8-2-41 Cup Holder
8-2-41-1 Tools
• No need tool
8-2-41-2 Removal procedure
1.) Remove the cup holder.
2.) Perform the following functional tests. If all are successful, include the debrief script provided below.
8-2-41-3 Mounting Procedure
Install the new parts in the reverse order of removal.
Figure 8-131 Cup holder
Table 8-42 Functional Tests
Service Manual
Section
Functional Test / Diagnostic Test Debrief Script
Section 4-3-1
Power On/Boot Up
“Service Manual, Direction
5394141, Rev 1+, Section 8-2-41. Equipment
passed all required tests and is ready for use. “
Section 4-3-2
Power Off / Shutdown
Section 4-8-1
Cover Parts Function Validation
Section 10-5-5
Physical Inspection