GE HEALTHCARE
DIRECTION 5394141, REVISION 5 LOGIQ™ P5 SEVICE MANUAL
Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8-73
8-2-28-3 Removal procedure (cont’d)
11.)Perform the following functional tests. If all are successful, include the debrief script provided below.
8-2-28-4 Mounting Procedure
Install the new parts in the reverse order of removal.
Table 8-29 Functional Tests
Service Manual
Section
Functional Test / Diagnostic Test Debrief Script
Section 4-3-1
Power On/Boot Up
“Service Manual, Direction
5394141, Rev 1+, Section 8-2-28. Equipment
passed all required tests and is ready for use. “
Section 4-3-2
Power Off / Shutdown
Section 4-9-5
APS/APS Pro Assy PCB Function Validation
Procedure
Section 10-5-2
Functional Checks (See Also Chapter 4)
Section 10-5-5
Physical Inspection