GE HEALTHCARE PROPRIETARY TO GE
D
IRECTION 5394227, 12 LOGIQ S8/LOGIQ E8 SERVICE MANUAL
3 - 44 Section 3-9 - Optional Peripherals/Peripheral Connection
3-9-2-2 Connecting the On-Board UVC
1.) Power OFF/Shutdown the system as described in Section 3-7 "Power On/Off" on page 3-17
2.) Connect the UVC according to correct connection scheme.
Figure 3-31 R2 On-Board UVC Connection
WARNINGWARNING
AFTER EACH INSTALLATION, THE LEAKAGE CURRENTS HAVE TO BE MEASURED
ACCORDING TO IEC 60601-1 RESPECTIVELY UL 60601-1.