ArcGlide THC Instruction Manual 806450 83
2–Installation
7. Install the air supply to the filter/regulator inlet port at 6.9 bar (100 psi), the recommended pressure.
8. Adjust the filter/regulator to indicate 2 bar (30 psi), the recommended starting pressure, on the gauge. Typical
operating pressure is 2.75 bar to 4 bar (40 psi to 60 psi)
9. Simulate a crash by forcing the breakaway to separate by hand.
10. Manually reposition the breakaway in the locked position.
11 . Adjust the air pressure until the desired trip force is achieved.
12. Enable the emergency stop circuit at the CNC after the breakaway is installed.