MAINTENANCE
HySpeed HT2000LHF Instruction Manual 5-19
7
Preventative Maintenance
chedule Year________
Daily:
Verif
ro
er inlet
as
ressure -- See Instruction Manual
S
ecification
section
Verif
ro
er
as flow settin
s -- Mandator
at ever
consumable chan
e -- See Instruction Manual,
O
eration
section
Verif
ro
er coolant
ressure and tem
erature -- Water Chillers onl
-- See Instruction Manual,
S
ecification
section
Re
lace consumables as needed
and ins
ect torch
Weekly: Date Completed:
Jan Feb March April May June July Aug Sept Oct Nov Dec
Week 1
Week 2
Week 3
Week 4
Week 5
Clean power supply with dry, oil free compressed air, or vacuum Clean torch threads and current rin
Verif
coolin
fans are workin
ro
erl
Verify proper coolant level
Monthly: Date Completed:
Jan Feb March April May June July Aug Sept Oct Nov Dec
Inspect for loose wire connections
Inspect contacts on main contactor for wear
Ins
ect
ilot arc rela
for
ittin
Verify proper operation of coolant flow switches
Perform coolant flow test
Check gas console packing nuts for tightness
Perform
as leak test
Inspect cable connections
Bi-Annually: Date Completed:
Service 1________ Service 2________
Drain coolant s
stem -- See Instruction Manual,
Maintenance
section
Re
lace coolant filter element - See Instruction Manual
Maintenance
section
Re
lace coolant with
enuine H
ertherm coolant
Annually: Date Completed:________
Re
lace
ilot arc rela
Replace main contactor