v Each enclosure has two power supply units. To provide power failure
redundancy, connect the two power cords to separate power circuits.
v Review the information on securing the power cables to ensure that each
power cable is secured to each PSU on the back of the enclosure.
5. From the rear of the control enclosure, check the LEDs on each node canister
(see Figure 141).
1 Power
2 Status
3 Fault
The canister is ready with no critical errors when Power is illuminated, Status
is flashing, and Fault is off. If a canister is not ready, refer to the “Procedure:
Understanding the system status using the LEDs” topic in “Troubleshooting”.
v3500064
2
3
1
Figure 141. Node canister LEDs
Chapter 2. Installing the system hardware 155

Table of Contents

Other manuals for IBM Storwize V5010

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the IBM Storwize V5010 and is the answer not in the manual?

IBM Storwize V5010 Specifications

General IconGeneral
ModelStorwize V5010
Form Factor2U
Maximum Raw CapacityUp to 480 TB
Drive Bays12
Operating SystemIBM Spectrum Virtualize
Drive TypesSSD
ControllerDual Controller
ConnectivityiSCSI, Fibre Channel
Host InterfaceFC, iSCSI
RAID Levels Supported0, 1, 5, 6, 10
Management InterfaceGUI, CLI, SNMP
Storage TypeBlock
Cache Memory8 GB

Related product manuals