EasyManuals Logo
Home>jcb>Compact Excavator>19C-1E

jcb 19C-1E User Manual

jcb 19C-1E
180 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #139 background imageLoading...
Page #139 background image
Maintenance
Body and Framework
Body and Framework
General
Clean
Keep all intakes and grilles clear from snow, ice and debris.
Debris can collect under the boom. Remove all debris from under the boom.
Thoroughly dry the piston rams and protect them with clean transmission or hydraulic oil if necessary.
Check (Condition)
1. Make sure that all of the guards and protective devices are in position, secured by their locking devices
and free from damage.
2. Inspect all of the steelwork for damage. Include the following:
2.1. Examine all of the lifting point welds.
2.2. Examine all of the pivot point welds.
2.3. Examine the condition of all the pivot pins.
2.4. Check that the pivot pins are correctly in position and secured by their locking devices.
3. Check the steps and handrails are undamaged and correctly attached.
4. Check for broken, cracked or crazed window glass and mirrors. Replace the damaged items.
5. Check that the lamp lenses are undamaged.
6. Check that all of the attachment teeth are undamaged and correctly attached.
7. Check that all of the safety and instructional labels are undamaged and in position. Install new labels where
necessary.
8. Note any damaged paintwork for future repair.
9. Inspect the machine for broken or loose fasteners.
Slew Ring Bearings
Lubricate
WARNING You will be working close into the machine for these jobs. Lower the attachments. Remove
ignition key and turn the battery isolator to the off position. This will prevent the motor being started.
Make sure that the slew ring is kept full of grease.
With the cab in the straight ahead position as shown, the grease point is located near the front of the slew
ring. Refer to Figure 101.
Notice: Do not overgrease the slew ring as this will result in the displacement of the grease seal.
129 9831/8250-4 129
JCB © Admin Pimteam - 23/06/2021 05:32.

Table of Contents

Other manuals for jcb 19C-1E

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the jcb 19C-1E and is the answer not in the manual?

jcb 19C-1E Specifications

General IconGeneral
Battery TypeManganese laminated Lithium-ion
Battery Rated Capacity14.8 kWh (3 Pack) 19.8 kWh (4 Pack)
ChargingOn-board charger with direct connection from AC mains power supply
Charging Time110V – 12 hrs 230V – 8 hrs
Fast Charging (Optional)Off-board charger, with connection to 415V 3-Phase supply Charging time <2 hrs
System Voltage48V
Motor TypeAC permanent magnet
Motor Power7 kW continuous 20kW peak
Operating ModesL – 1200rpm G – 1600rpm H – 1800rpm Auto Kick Up – 2300rpm, 2 speed tracking only
Thermal LimitationsOperation: -10oC to +46oC Charging: -10oC to +40oC

Related product manuals