Operation
Working with the Machine
132 132
9811/9950-1
Working on Slopes
When working on inclines, position the dozer for maximum
stability. This may mean the dozer and the boom are at the
same end of the machine, especially if digging down hill,
lower the dozer sufficiently to bring the machine level. If
necessary, to prevent an instability problem, cut a level
platform for the machine to stand on.
732230-4
Fig 61.