Routine Maintenance
Service Schedules
171 171
9811/9950-1
How to Use the Service Schedules
T3-012_4
In the example shown, A shows all service requirements to
be carried out every 10 hours and B shows the
requirements to be carried out every 500 hours.
Important: Services should be carried out at either the
hourly interval or calendar interval, whichever occurs first.
Refer to Calendar Equivalents.
Important: The intervals given in the schedules must not
be exceeded. If the machine is operated under severe
conditions (high temperature, dust, water, etc.), shorten
the intervals.