Operation
Working with the Machine
134 134
9811/9950-1
Scraping and Cutting
If a deep cut is to be made, do it in steps of about 50mm
(2in). Do not forget to adjust the dozer height when the
machines tracks enter the cut.
Backfilling
When backfilling on a slope, pile the material on the high
side of the trench whenever possible. Set the dozer level
to the ground. Work at right angles to the trench filling a
dozer's width at a time. Leave any spillage until the trench
is filled. Use the spillage to finish the job by driving the
length of the trench with the dozer low to the ground.
732030-2
Fig 63.