Operation
Working with the Machine
134 134
9811/9950-1
Scraping and Cutting
If a deep cut is to be made, do it in steps of about 50mm
(2in). Do not forget to adjust the dozer height when the
machines tracks enter the cut.
Backfilling
When backfilling on a slope, pile the material on the high
side of the trench whenever possible. Set the dozer level
to the ground. Work at right angles to the trench filling a
dozer's width at a time. Leave any spillage until the trench
is filled. Use the spillage to finish the job by driving the
length of the trench with the dozer low to the ground.
732030-2
Fig 63.
HE Services

Table of Contents

Other manuals for jcb 30PLUS

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the jcb 30PLUS and is the answer not in the manual?

jcb 30PLUS Specifications

General IconGeneral
Brandjcb
Model30PLUS
CategoryExcavators
LanguageEnglish

Related product manuals