EasyManuals Logo
Home>jcb>Construction Equipment>Dumpster HTD5

jcb Dumpster HTD5 User Manual

jcb Dumpster HTD5
181 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #114 background imageLoading...
Page #114 background image
Section E - Hydraulics
E-17 E-17
9803-9570-4
Pressure Testing
Main Relief Valve (M.R.V.)
Make sure that the hydraulic oil is at correct working
temperature (50 °C, 122 °F).
Remove the engine cover (if fitted) K
Engine
Cover ( T B-1) and move the engine back on its mounting
to gain access K Engine Mounting ( T K-3).
On early machines, disconnect the inlet hose from the
valve block and refit using a tee piece and pressure test
point C. Later machines are already fitted with a test point.
Note: On early machines the test point may be left on the
machine permanently.
Connect a 0 - 400 bar (0 - 6000 lb/in
2
, 0 - 422 kg/cm
2
)
pressure gauge to the test point.
With the engine running at maximum speed, check the
M.R.V. setting by raising or lowering the skip until the rams
are fully open or closed and noting the maximum gauge
reading. Keep clear of the skip. The maximum pressure
should be as stated in K
Technical Data ( T E-1).
If the pressure is incorrect, slacken lock nut A on the main
relief valve and turn adjusting screw B clockwise to
increase the pressure or anti-clockwise to decrease the
pressure. Tighten lock nut A and re-check the pressure.
Remove the pressure gauge.
Move the engine back into its correct position K
Engine
Mounting ( T K-3) and refit the engine cover K Engine
Cover ( T B-1).
Fig 1.
Fig 2.
C
A
B
manualequipospesados@gmail.commanualequipospesados@gmail.com

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the jcb Dumpster HTD5 and is the answer not in the manual?

jcb Dumpster HTD5 Specifications

General IconGeneral
Brandjcb
ModelDumpster HTD5
CategoryConstruction Equipment
LanguageEnglish

Related product manuals