Section J - Tracks
Track Repair
Recommended Repair Procedures
J-28 J-28
9803-9570-4
Fig 4.
5 Ensure that the adhesive applied in step 3 has
completely dried and then apply another adhesive
layer. When the second adhesive layer is almost dry
(sticky to the touch) the rubber compound should be
firmly applied to the cut. The compound should be 2
to 3 mm higher than the original rubber track.
6 Allow to harden.
Approximate curing times:
- 24 hours @ 30°C
- 48 hours @ 40 - 45°C
- 72 hours @ 50 - 60°C
Additional Notes:
If the cut is on the track edge, this is more difficult to repair.
In some instance, it is possible to repair with a strong
bonding adhesive.
manualequipospesados@gmail.commanualequipospesados@gmail.com