CHAPTER 11
Installing the Chassis
IN THIS CHAPTER
Before You Install the CTP150 Platform | 59
Installing the CTP150 Platform in Freestanding Mode | 60
Installing the CTP150 Platform in a Rack | 60
Before You Install the CTP150 Platform
Before installing the platform:
•
Refer to the platform specifications for the particular CTP model or series.
•
Have a plan for installing the device that takes into consideration future expansion.
•
Have the tools and accessories needed to complete the installation.
•
Read and understand the clearance requirements for the front and back of the chassis for cable routing
and other unit access. See“CTP150 Environmental Requirements” on page 21 for more information.
•
Read and understand the clearance requirements for the top and bottom of the chassis to ensure adequate
ventilation.
•
Prepare the equipment racks by measuring and marking space for each device and plenum you plan to
install.
RELATED DOCUMENTATION
Installing the CTP150 Platform in a Rack | 60
Installing the CTP150 Platform in Freestanding Mode | 60
59