Site Preparation Checklist for SSR130
The checklist in Table 7 on page 19 summarizes the tasks you need to perform when preparing a site for
SSR130 installation.
Table 7: Site Preparation Checklist
DatePerformed byFor More InformationItem or Task
Environment
“Environmental Requirements and
Specifications for SSR130” on
page 22
Verify that environmental factors such as
temperature and humidity do not exceed
appliance tolerances.
Power
Measure distance between external power
sources and installation site.
Locate sites for connection of system
grounding.
Calculate the power consumption and
requirements.
Rack
“Rack Requirements for SSR130”
on page 24
Verify that your rack or cabinet meets the
minimum requirements for the installation
of the appliance.
Plan rack location, including required space
clearances.
Secure the rack or cabinet to the floor and
building structure.
Desk
“Requirements for Mounting an
SSR130 Appliance on a Desktop
or Other Level Surface” on
page 24
Verify that the desk meets the minimum
requirements for the installation of the
appliance.