DIESEL ENGINE
05
SERIES
WSM,
01640
I
Itj
H
IC/
H
I
00000Fl0200
Replacing Idle Gear Bushing
(A)
(When removing)
1.
Using an idle gear bushing replacing tool (see page
S-69),
press
out the used bushing.
(e)
(When installing)
1.
Clean a new idle gear bushing and idle gear bore, and apply
engine oil to them.
2.
Using an idle gear bushing replacing tool, press in a new
bushing (service parts) to the specified dimension. (See figure.)
00000510161
[3]
PISTON
AND
CONNECTING
ROD
Piston Pin Bore
I.D.
1.
Measure the piston pin bore I.D. in both the horizontal and
2.
If the measurement exceeds the allowable limit, replace the
vertical directions with a cylinder gauge.
piston.
00000s10212
Oil Clearance between Piston Pin and Small End Bushing
1,
Measure the O.D.
of
the piston pin where
it
contacts the bushing
2.
Measure the I.D. of the piston pin bushing at the connecting rod
3.
If the clearance exceeds the allowable limit, replace the bushing.
with an outside micrometer.
small end with a cylilnder gauge.
Calculate the oil clearance.
If
it
still exceeds the allowable limit, replace the piston pin.
00000510222
s-I19
Redistribution or publication of this document,
by any means, is strictly prohibited.